top of page
B17 LOGO.png
Donate here

Smoke box door is almost complete

  • Writer: Steven Cooper
    Steven Cooper
  • Jun 4
  • 1 min read

In the past two weeks, the hinge blocks were fitted to the ring&seal and the hinges were bolted to the door, following which the bolt heads were ground down so they are flush with the hinges. The resulting assembly was then mounted onto the ring, resulting in the photo below. Following the delivery of the chimney, machined by Daniela, the chimney has been temporarily mounted on the Wrapper. Today, the whole unit has been hoisted back onto the Chassis ready for the Open Day on 11th April.


 
 
 

Comments


bottom of page